Zahedan-Younesi railway studies
Zahedan-Younesi railway studies
881 Km Single Track Railway
Axle Load: 25 Ton
24 Tunnels with the Total Length of 11,220m and the Width of 7m with Maximum Length of 3700 m
134 Bridges with the Total Length of 32,710 m with Maximum Length of 1000 m
43 Staion of overtaking and crossing type
Superstructure Details
Type: Ballast
Rail: UIC 60 E1
Sleepers: B70
Fastening System: SKL14